Facilities Preparation and Operations Team

This post was updated on

Managing the needed changes to support the requirements that will be necessary throughout the campus facilities at both Orange and Irvine campuses includes but is not limited to:

Executing on Physical Distancing Modifications such as: 

  • Defining occupancy limits 
  • Installing signage throughout the campuses

Sanitation Efforts and Cleaning Protocol 

Face Coverings and PPE Distribution

Facility Access / Entry Control 

Protocol high touch locations such as doors and stairways

HVAC and Mechanical Protocol